<source id="ckfq2"><div id="ckfq2"></div></source>

<b id="ckfq2"></b>

  • <sub id="ckfq2"><tr id="ckfq2"></tr></sub>

        <wbr id="ckfq2"><big id="ckfq2"></big></wbr>

      1. <input id="ckfq2"><div id="ckfq2"></div></input>
      2. <input id="ckfq2"><div id="ckfq2"></div></input>
          <mark id="ckfq2"></mark>

        < project | Previous project >

        Morocco: Turnkey Project-Drinking Water Treatment Plant in Fès and Meknès

        Eptisa is responsible for the design and construction of a Drinking Water Treatment Plant, for a flow of 2,000 l/s, including the construction of a water tank of 20,000 m3 and a pumping station.
        戚薇与多男视频导航